-->

All West Communications Fiber Optic Network/Sod Care

Sod Care FlyerAll West Communications is installing a fiber optic network in Tooele City within a Public Utility Easement (PUE). This easement grants them the right to access and use a portion of private property for utility infrastructure.

During installation, any disrupted landscaping will be restored. To care for new sod, follow these steps:
1. Water daily for the first two weeks, reducing frequency as roots establish.
2. Avoid mowing new sod for 2-3 weeks until the sod firmly roots, then mow at the recommended height.
3. Apply balanced, slow-release fertilizer 4-6 weeks after installation.
4. Hand-pull weeds until the sod is established; avoid herbicides.
5. Minimize foot traffic in the first few weeks.
6. Avoid soil compaction during establishment.
7. Consider overseeding any thin spots after establishment.
8. Monitor for stress, disease, or pests; address promptly.
9. Aerate the lawn, including new sod once it has matured.
10. Adjust irrigation to ensure adequate water without overwatering.
Following these steps will ensure a seamless integration of new sod into your existing lawn.

If you have any questions, you can contact All West Communications at 833-386-9498 or visit https://info.allwest.com/tooele.

This may also be a good time to look at replacing the grass in your park strip with drought-tolerant landscaping. Visit utahwatersavers.com to see if you are eligible for their programs and rebates.